Contingency Analysis:We tried to add defaults in an ideal working power system and see what are the changes and deforms arising into the system. I tried to include loop concepts and electrical operative values to built an ideal working power system and slowly added one after another contingency to see the differences and make a report on how it was affected and what can we do to stop it.