Sultanpur, Uttar Pradesh, India
Land Surveyor, Quantity Surveyor, Highway Engineer
यूजर के बारे में
As a diploma civil engineer with over 19 years’ experience in the highway infrastructure schemes in India, these have included roles as General Manager, Project Manager, Manager Highway, Manager Survey & Design, Asst Manager, Engineer, Survey In-charge & Surveyor.
प्रतिभा
काम का अनुभव
As a Project Manager
Apco Infratech Ltd
पूरा समय फरवरी-2018 तक वर्तमान 7 वर्षों 1 महीना
जिम्मेदारियों
  • ? Organizing construction, supervision including execution, quality assurance, checking of measurement, revision of design of highway, bridges and CD works. ? Developing and implementing policies for improvement of the work culture. ? Setting realistic goals for financial year wise turnover and profit margin. ? Creating positive environment for the employees for him skill development, managing the hierarchy at peak time of work to the utmost efficiency of every employee. ? Review and approve adequate project plans for the control of planned outputs, budget spending, labour efficiency, material efficiency, engineering effectiveness along with human utilization. ? Review performance against plans and standards, provides reports to subordinates on interpretation of results and approves changes in direction of plans, managing critical activities. ? Ensure setting up of milestones for quality inspections, project review and monitoring the same.
उपलब्धियां
  • Within 6 month we have complete 50% work
As a Project Manager
Absolute Built Concept Private Limited
पूरा समय सितम्बर-2014 तक फरवरी-2018 3 वर्षों 5 महीने
जिम्मेदारियों
  • Two laning of exiting Hunli-Anini Road on EPC basis from design Km 21.500 to Km 37.500 (Existing Km 21.450 to Km 40.160) in the state of Arunachal Pradesh under SARDP-NE
As a Highway Manager
Isolux Corsan India Engineering & Construction Pvt. Ltd
पूरा समय जनवरी-2012 तक सितम्बर-2014 2 वर्षों 8 महीने
जिम्मेदारियों
  • 4/6 Laning of Gujarat / Maharashtra Surat-Hazira port section of NH6 in the State of Gujarat under NHDP phase III on DBFO basis from KM. 0+000 to 132+913
As a Survey Manager
C & C Construction Ltd
पूरा समय अगस्त-2009 तक जनवरी-2012 2 वर्षों 5 महीने
जिम्मेदारियों
  • Widening and strengthening of Una-Barasr-Bhota-Bhamala-kalkhar-Ner Chowk road section pkg.: No SRP/RIDC/HP/3
As an Asst. Manager
Continental Engineering Corporation
पूरा समय मई-2008 तक अगस्त-2009 1 साल 3 महीने
जिम्मेदारियों
  • Four laning of Hyderabad - Bangalore Section of NH-7 from Km 293 to Km 335 in Andhra Pradesh under north south corridor contract package ADB-II/ C- 12
As an Engineer
Punj Lloyd Ltd
पूरा समय अगस्त-2005 तक मई-2008 2 वर्षों 9 महीने
जिम्मेदारियों
  • All Survey Activity
उपलब्धियां
  • Widening and strengthening of existing national highway from 2 Lane to 4 Lane (KM: 1065 to 1093 of NH-31) of Guwahati to Nalbari section (Contract Package EW- II AS-05) under phase-II programme of east west corridor project in Assam).
As a Survey In-Charge
Vijay Expressway Engineers Ltd
पूरा समय मई-2002 तक अगस्त-2005 3 वर्षों 3 महीने
जिम्मेदारियों
  • All Survey Activity
उपलब्धियां
  • Upgradation of U.P. S.H. road World Bank project from Jaunpur to Mohammadpur, including maintenance of Jaunpur City Portion (U.P.S.R.P.03-45Km)
शिक्षा
Diploma in Creative Writing in English
Aryabharathi PolytechnicDepartment of Technical Education
1996-1999 स्कोर67%
प्रोफाइल स्नैपशॉट
Sandeep Sultanpur से बाहर है और CE-Civil Engineering, DCE-Diploma in Creative Writing in English वर्ष 1996-1999 से ABP-Aryabharathi Polytechnic, Department of Technical Education का अध्ययन किया है।
Sandeep Tiwari Land Surveyor, Quantity Surveyor, Highway Engineer और अन्य प्रतिभाओं में प्रतिभाशाली है