Mumbai, Maharashtra, India
Profile Snapshot
Gurunath is based out of Mumbai & has studied ME-Mechanical Engineering, from Year 2009-2011 in JNRM-Jawaharlal Nehru Rajkeeya Mahavidyalaya, Pondicherry University.
Gurunath Rajaram Dalvi is Skilled in English Language, Quick Learner, Multi Tasking and other talents.
Talents
    • Quick Learner
      ... among 0 users in Mumbai
      among 0 users worldwide
    • Multi Tasking
      ... among 0 users in Mumbai
      among 0 users worldwide
    • Science and Technology
      ... among 0 users in Mumbai
      among 0 users worldwide
    • Self Disciplined
      ... among 0 users in Mumbai
      among 0 users worldwide
Professional Path
Senior Engineer
Jul-2014 To present 11 years 1 months
  • Responsible to on time delivery , international quality product, after sales service and product technical support

    To put all efforts to improve efficiency of the product with effective cost cutting

    To commit to achieve total customer satisfaction through design, development, manufacturing & supply of consistent quality products & systems with aim of less percentage rejection at customer end while remaining cost effective & competitive

    As a team leader to encourage the team for continual improvement in all our areas of operation

    Responsible to give priority to safety measures to avoid troubles to workers & processes

    To assemble the machine in that stage to ensure that the machine is according to the requirement

    Identifying the rework that increase the lead time of assembly, to correct that part through necessary design changes

    Responsible for implementation the corrective action & preventive actions for the improvement of Productivity
Junior Executive
Sep-2013 To Jun-2014 9 months
  • To put all efforts to improve efficiency of the product with effective cost cutting
    Responsible to give priority to safety measures to avoid troubles to workers & processes
    Responsible to dispach on time as per monthly dispach plan
    To provide necessory training to co workers to increase productivity
    Responsible for implementation the corrective action & preventive actions for the improvement of Productivity


    Responsible to handle man , material and machines on shopflor
    To maintain discipline on shopflor
Service Engineer
Jan-2013 To Sep-2013 8 months
  • Responsible for implementation the corrective action & preventive actions for the improvement undertaken in the up-coming machines

    .To aware customer about new arrivels and upcoming products

    To try to resolve the minor issues of machines by phone call, if possible

    To give full support to the Design Engineer for the improving the machine functionally & aesthetically

    Responsible for the total Installation & commissioning of machines

    Always try to serve satisfaction to our customer
Technician
Jun-2003 To Jan-2013 9 years 7 months
  • Responsible to check and select the correct set of spare parts for the specified type of transmission as per specifications given in standard operating procedure.

    To check prepared metal components for accuracy, using measuring instruments such as micrometers, calipers & rules.

    To study drawings & specifications to determine methods & sequences of operations.

    To do required action for tests and checks.

    To find out and rectify leakages in pneumatic & hydraulic assemblies if any.

    To remove high spots and cuts bevels, using hand files, portable grinders, and cutting torch.

    To give total involvement to make speciale purpoes machines success on design as well as implementation stages
  • Successfully worked on various projects, such as Electronic batch counter, DCW1000, etc.
    Projects done helped the company in gaining profit
    Successfully installed the first project Micro tablet filling attachment at Dr. Reddys Lab, Hyderabad
Assembly fitter
Nov-2000 To May-2003 2 years 6 months
  • assemble the machine in that stage to ensure that the machine is according to the requirement
    To ensure that the machine is in plug-in-play type
    Identifying the rework that increase the lead time of assembly, to correct that part through drawing
    To ensure that the parts comes with the changes in future & no problems occur in assembly

    Types of machines : Vial cleaning machines & Process equipments
» 1 Project
Qualifications

Jawaharlal Nehru Rajkeeya Mahavidyalaya

Mechanical Engineering

2009-2011

-%

Government Industrial Training Institute

Trainee Associate (RASCI) Industrial Engineering

1996-1998

67%

Government and Private Industrial Training Institutes

National Trade Certificate Industrial Production

1994-1996

71%

Extra-Curricular Interests
Reading listening music
My Story
Having 15 years of experience in engineering manufacturing field, mainly service/ assembly and maintenance